Flagship Project - Completed

Sota Shine One-Six-Nine

A Completed Flagship Express Tunnel in Brooklyn Park

Our most ambitious build is complete. Explore the construction journey behind Sota Shine One-Six-Nine, with finished-site photography coming soon.

Record status:   No official world-record title has been awarded to this project. Previous references to "World's Longest Carwash" described a design ambition, not a certified title.

Project Completed

The Build Is Complete

Sota Shine One-Six-Nine in Brooklyn Park, MN is now a completed project. The photos below document construction, not the current finished condition. We're collecting more images to share the finished site.

Project Backlink

Sota Shine One Six Nine

Follow the public-facing project page for this flagship build at Sota Shine One Six Nine. We've also included the site address below for reference.

8201 108th Court North, Brooklyn Park, MN 55445

Visit Sota Shine Project Page

What To Expect

  • Public project branding tied to the Sota Shine One Six Nine site.
  • A completed flagship express tunnel with a construction photo archive.
  • Finished-site photography coming soon. No official world-record title has been awarded.
The Build

A project on a scale of its own.

300+ ft
Tunnel Design Length
30+
Indoor Vacuum Stalls
38
Job Site Photos
Complete
Project Status
Build Timeline

From Dirt to Drive-Through

A look back at the construction journey behind this completed flagship project.

  1. Conveyor trench excavation and forming inside the tunnel buildingComplete

    Phase 1 · Spring 2026

    Foundations & Conveyor Pit

    Excavation, under-slab plumbing, and forming the 300+ foot conveyor trench that anchors the tunnel.

  2. Exterior of the completed tunnel building with fresh pavingComplete

    Phase 2 · Summer 2026

    Building Enclosed & Site Paved

    Building shell complete, interior open and lit, parking lot paved, and site signage installed.

  3. Wash equipment being installed along the conveyor inside the tunnelComplete

    Phase 3 · August 2026

    Tunnel Equipment Install

    Conveyor, wash arches, brushes, water treatment, chemical storage, and electrical installed along the tunnel.

  4. Photos coming soon
    Complete

    Phase 4 · Fall 2026

    Project Completed

    The flagship build is complete. Finished-site photography will be added as it becomes available.

Project Highlights

The Scale of This Flagship Build

Purpose-built systems for a high-volume express wash operation.

Large-Scale Express Tunnel

Designed with a tunnel length of more than 300 feet, with integrated wash equipment and coordinated conveyor systems. Design length is not a certified world-record measurement.

Express-Format Throughput

Designed from the start for high-volume operation, with wash arches and dryers positioned for consistent vehicle flow and wash quality.

Design-Built by Our Team

Planning, civil, equipment, installation, startup. This is what 50+ years of combined experience looks like at full scale.

Indoor Vacuum Hall

Vacuum Space on a Massive Scale

Minnesota winters are brutal. Rain, snow, freezing temps - nobody wants to vacuum their car in the elements. That's why this build includes a fully enclosed, 100% climate-controlled indoor vacuum hall with more than 30 vacuum stalls.

The room you're looking at is enormous - high ceilings, open floor, built to accommodate serious capacity. Customers drive in, vacuum in total comfort, and leave with a clean car no matter what's happening outside.

  • 30+ vacuum stalls in a 100% climate-controlled room
  • Beats Minnesota snow, wind, and freezing temps
  • Mat washers and compressed air at the stalls
  • Detail carts with towels, all-purpose cleaner, and glass cleaner
Sota Shine One-Six-Nine indoor vacuum hall during construction in August 2026

Indoor Vacuum Hall - August 2026

Sota Shine One-Six-Nine - Construction Archive

Inside The Build

What Goes Into a 300+ Foot Tunnel

Construction archive: the systems coming together behind the walls, from the conveyor to the equipment room.

Stainless wash arch frames along the conveyor

Conveyor & Wash Arches

Stainless frames and wash components set along the conveyor, running the full length of the tunnel.

Friction wash brushes mounted in the tunnel

Friction Wash Equipment

Brush drive motors and mounting frames set in place ahead of brush installation and commissioning.

Water softener tanks in the equipment room

Water Treatment

Water softeners and treatment plumbing in the equipment room for consistent wash and rinse quality.

Large storage tanks along the tunnel wall

Storage Tanks

Large-capacity tanks staged in the equipment corridor to support high-volume operation.

Electrical control panel with conduit runs

Controls & Electrical

Panels and conduit runs feeding equipment down the length of the tunnel.

View down the tunnel conveyor toward the exit door

Down the Conveyor

Looking along the conveyor toward the open tunnel door, with arches framed overhead.

April 2026

2 photos

July 2026

16 photos

Showing 6 of 16 photos

August 2026

20 photos

Showing 6 of 20 photos

Next Update

Commissioning & Grand Opening Photos

The project is complete. We'll add finished-site photos as they become available.

Visit Sota Shine
FAQ

Sota Shine One-Six-Nine: Common Questions

Where is Sota Shine One-Six-Nine?

At Sota Shine One-Six-Nine, 8201 108th Court North in Brooklyn Park, MN - just off Highway 169 and 109th Avenue North, serving Brooklyn Park, Champlin, Osseo, and Maple Grove.

Is the project complete?

Yes, the Carwash Technologies flagship build is complete. Visit Sota Shine's website for current customer hours and operating information. Finished-site photos will be added here as they become available.

How long is the tunnel?

The tunnel was designed at more than 300 feet. This is a design specification, not a certified record measurement. No official world-record title has been awarded.

What is the indoor vacuum hall?

A fully enclosed, climate-controlled room with more than 30 vacuum stalls, plus mat washers, compressed air, and detail carts with towels, all-purpose cleaner, and glass cleaner - so customers can clean their interiors comfortably year-round.

Can Carwash Technologies build a project like this for me?

Yes. We design, build, install, and service express tunnels, vacuum systems, and complete wash sites across Minnesota, North Dakota, South Dakota, and Wisconsin. Reach out and we will talk through your site, volume, and goals.

Ready to Build Your Next Wash?

Talk with the team behind Sota Shine One-Six-Nine about equipment, installation, and long-term support for your operation.

Prefer to talk now?Call (612) 408-9010